From the
Formation Up.
Three-shift operations. Diamond-wire saws and 40-ton blast loads. Every step engineered for consistent gradation and purity.

Blast Planning
Precision-engineered shot patterns fracture the formation at depth, minimizing fines and maximizing yield per bench.

Primary Crushing
60-inch jaw crushers reduce run-of-mine stone to minus-6-inch product in a single pass — 1,200 tph rated capacity.

Screening & Grading
Multi-deck vibrating screens sort aggregate into 14 certified gradations — from #57 stone to 12-inch rip-rap.
CAT 777G Fleet · 14 Haulers
100-ton payload per cycle. Average haul cycle 18 min pit-to-crusher. GPS dispatch on every truck.
The Backbone
of Public Works.
From the highway you drive to the water you drink — our stone is already there, doing the work that holds communities together.

Highway Base Course
AASHTO M147 · Class A
Compacted limestone base supporting 40-year pavement design life on interstate and state highway projects.

Ready-Mix Concrete Feed
ASTM C33 · #57 & #67
Consistent calcium carbonate purity ±0.3% for reliable mix designs across high-volume batch plants.

Water Treatment
NSF/ANSI 60 · AG-Lime
Food-grade calcium carbonate dosing for pH correction in municipal water and wastewater treatment facilities.

Rip-Rap & Armor Stone
VDOT Class I–IV · 6"–24"
Angular armor stone for erosion control, bridge abutment protection, and stormwater channel lining.
The Numbers
That Matter.
Fleet capacity, certified gradations, and DOT approvals — every metric a specifying engineer needs before writing a purchase order.
Tons / Day
Average daily production across all active benches
Haul Trucks
CAT 777G fleet, 100-ton payload rated capacity
In Operation
Family-owned since 1987, now serving 6 states
Tons / Call
Two-week delivery on orders up to ten thousand tons
Verified Certifications & Compliance
AASHTO M147
Base Aggregate
ASTM C33
Concrete Aggregate
NSF/ANSI 60
Water Treatment
VDOT Class I–IV
Rip-Rap / Armor
State DOT
Approved Supplier
MSHA Compliant
Safety Certified

Fleet Availability
14 CAT 777G Haulers · GPS Dispatched
Average 18-min haul cycle, pit-to-crusher
Where Our Stone
Already Serves.
240+ completed public infrastructure contracts across Virginia, West Virginia, Maryland, Tennessee, North Carolina, and Kentucky.
I-64 Widening, Albemarle Co.
48,000 tons · Highway Base
2024
Roanoke Water Treatment Plant
12,000 tons · AG-Lime
2024
Route 29 Bypass, Lynchburg
31,500 tons · Road Base
2023
James River Flood Wall
8,200 tons · Rip-Rap
2023
Shenandoah Valley Interchange
22,000 tons · Concrete Aggregate
2025
Charlottesville Stormwater
5,400 tons · Rip-Rap
2025
US-29 Bridge Abutment
18,700 tons · Concrete Aggregate
2024
240+
Projects
Recent Contracts
I-64 Widening Phase 2
DeliveredVDOT District 9
Water Treatment Upgrade
OngoingCity of Roanoke
Route 29 Bypass
DeliveredLanford Bros. Inc.
James River Flood Wall
DeliveredUSACE Baltimore
Download Our Spec Sheet
Full gradation tables, test reports, and DOT approval letters — everything your engineering team needs.
Request a
Tonnage Quote.
Fill out the form and a project coordinator will respond within 4 business hours with pricing, availability, and delivery lead time.
