LogoQuarryLanding
Limestone quarry terraced benches rising toward a wide open sky, a loaded haul truck rounding the haul road in the mid-ground with dust catching golden sidelight
Est. 1987 · Central Limestone Formation

The Ground Beneath
Every Public Project.

Heavy-grade limestone for highway base, concrete aggregate, and water treatment. DOT-certified. 10,000 tons on a two-week call.

Download Spec Sheet
Pit Status
Active
Active Benches7 of 9
Daily Output3,400 tons
Next BlastFeb 28, 06:00
• DOT CERTIFIED • AVAILABLE NOW •
Scroll
Movement & Cause
Raw stone → Civic infrastructure
At The Quarry

From the
Formation Up.

Three-shift operations. Diamond-wire saws and 40-ton blast loads. Every step engineered for consistent gradation and purity.

Heavy drilling equipment on a limestone bench preparing blast holes in a quarry
01

Blast Planning

Precision-engineered shot patterns fracture the formation at depth, minimizing fines and maximizing yield per bench.

Industrial primary jaw crusher processing large limestone boulders at a quarry operation
02

Primary Crushing

60-inch jaw crushers reduce run-of-mine stone to minus-6-inch product in a single pass — 1,200 tph rated capacity.

Aggregate screening plant separating crushed limestone into different size gradations
03

Screening & Grading

Multi-deck vibrating screens sort aggregate into 14 certified gradations — from #57 stone to 12-inch rip-rap.

CAT 777G Fleet · 14 Haulers

100-ton payload per cycle. Average haul cycle 18 min pit-to-crusher. GPS dispatch on every truck.

In Your Community

The Backbone
of Public Works.

From the highway you drive to the water you drink — our stone is already there, doing the work that holds communities together.

Highway construction showing limestone base course being compacted by heavy roller equipment
Road Base

Highway Base Course

AASHTO M147 · Class A

Compacted limestone base supporting 40-year pavement design life on interstate and state highway projects.

Ready-mix concrete batch plant receiving limestone aggregate delivery for concrete production
Concrete Aggregate

Ready-Mix Concrete Feed

ASTM C33 · #57 & #67

Consistent calcium carbonate purity ±0.3% for reliable mix designs across high-volume batch plants.

Municipal water treatment plant facility using limestone calcium carbonate for pH adjustment
Water Treatment

Water Treatment

NSF/ANSI 60 · AG-Lime

Food-grade calcium carbonate dosing for pH correction in municipal water and wastewater treatment facilities.

Large angular limestone rip-rap stones protecting a riverbank from erosion at a bridge abutment
Rip-Rap

Rip-Rap & Armor Stone

VDOT Class I–IV · 6"–24"

Angular armor stone for erosion control, bridge abutment protection, and stormwater channel lining.

Scale & Compliance

The Numbers
That Matter.

Fleet capacity, certified gradations, and DOT approvals — every metric a specifying engineer needs before writing a purchase order.

0

Tons / Day

Average daily production across all active benches

0

Haul Trucks

CAT 777G fleet, 100-ton payload rated capacity

0yr

In Operation

Family-owned since 1987, now serving 6 states

0+

Tons / Call

Two-week delivery on orders up to ten thousand tons

Verified Certifications & Compliance

🛣️

AASHTO M147

Base Aggregate

🏗️

ASTM C33

Concrete Aggregate

💧

NSF/ANSI 60

Water Treatment

🪨

VDOT Class I–IV

Rip-Rap / Armor

✅

State DOT

Approved Supplier

⛑️

MSHA Compliant

Safety Certified

Fleet of CAT 777G haul trucks lined up at the quarry staging area ready for loading operations

Fleet Availability

14 CAT 777G Haulers · GPS Dispatched

Average 18-min haul cycle, pit-to-crusher

Completed Municipal Contracts

Where Our Stone
Already Serves.

240+ completed public infrastructure contracts across Virginia, West Virginia, Maryland, Tennessee, North Carolina, and Kentucky.

Service Region

I-64 Widening, Albemarle Co.

48,000 tons · Highway Base

2024

Roanoke Water Treatment Plant

12,000 tons · AG-Lime

2024

Route 29 Bypass, Lynchburg

31,500 tons · Road Base

2023

James River Flood Wall

8,200 tons · Rip-Rap

2023

Shenandoah Valley Interchange

22,000 tons · Concrete Aggregate

2025

Charlottesville Stormwater

5,400 tons · Rip-Rap

2025

US-29 Bridge Abutment

18,700 tons · Concrete Aggregate

2024

240+

Projects

Recent Contracts

I-64 Widening Phase 2

Delivered

VDOT District 9

Base Course + #5748,000 tons

Water Treatment Upgrade

Ongoing

City of Roanoke

NSF AG-Lime12,000 tons

Route 29 Bypass

Delivered

Lanford Bros. Inc.

#21A Road Base31,500 tons

James River Flood Wall

Delivered

USACE Baltimore

Class III Rip-Rap8,200 tons

Download Our Spec Sheet

Full gradation tables, test reports, and DOT approval letters — everything your engineering team needs.

Get Pricing

Request a
Tonnage Quote.

Fill out the form and a project coordinator will respond within 4 business hours with pricing, availability, and delivery lead time.

Pit Active — Taking Orders

Minimum order: 500 tons

For freight estimate

04 — Your Contact

Response within 4 business hours. No spam — ever.

DOT ApprovedMSHA Certified38 yrs Operating